Share Share Icon
Ships within 4 days
Chetak Electrical 0.5 HP 25-50 ft Single Phase Openwell Monoset Pump COWP
chetak-electrical-05-hp-25-50-ft-single-phase-openwell-monoset-pump-cowp
chetak-electrical-05-hp-25-50-ft-single-phase-openwell-monoset-pump-cowp

Chetak Electrical 0.5 HP 25-50 ft Single Phase Openwell Monoset Pump COWP

Visit the Chetak Electrical Store
EMI starts at ₹608/month. No Cost EMI available.
Available offers
Get Flat 10% off on your First Orders above ₹3,000

View

Get Flat 10% off on your First Order above ₹3,000

View

Get Flat 10% off on your First Order above ₹3,000

View

Get Flat 3% off on First Order above ₹4,000

View

Features
Phase Single Phase
Model No COWP
Type of Product Horizontal Openwell Submersible Pump
Voltage 220 V
i
return policy
7 Days Return Policy
100% Original Products
100% Original Products
Secure Payments
Secure Payments
100% Buyer Protection
100% Buyer Protection
Top Brands
Top Brands

Phase

Single Phase

Model No

COWP

Type of Product

Horizontal Openwell Submersible Pump

Voltage

220 V

Power

0.5 HP

Discharge Range

120-80 LPM

Head Range

25-50 ft

Country of Origin

India

Head (m)

7.62 m - 15.24 m

Suc X Del

25x25 mm

Head Range (m)

7.62 - 15.24 m

Suc x Del (mm)

25x25 mm

Head

25-50 ft

Outlet size

-

Name of Manufacturer/Packer/Importer

Chetak Electricals

FREQUENTLY BOUGHT TOGETHER
sku-leadTime Ships within 2 days
14
Pack of 10 ream
₹2,005 ₹2,005
0.01% OFF
oos-available Ships within 24 hrs
oos-available Ships within 24 hrs
oos-available Ships within 24 hrs
oos-available Ships within 24 hrs
oos-available Ships within 24 hrs
sku-leadTime Ships within 10 days
oos-available Ships within 24 hrs
oos-available Ships within 24 hrs
oos-available Ships within 24 hrs
oos-available Ships within 24 hrs
sku-leadTime Ships within 10 days
Be the first to write a review
₹6,843 (Incl. of all taxes)
₹5,799 + 18% GST
MRP ₹7,080
3.35% OFF
Minimum Order Quantity- 1
Check Delivery Details
PREPAID
Available
PART COD
Unavailable
COD
Unavailable
RETURN
Available Return period : 7 days